Allthefirewood |
All was going well as the windows went in, and the mid floor HySpan went up, it was great to see some light coming in where it will eventually be in our kitchen and lounge room. It was at this stage the Magdek was due to go on top of the floor truss; our contractor was on other jobs in Victoria; and it was a gruelling 3 weeks until we saw any more work on site. This product is also known as a Sip and doesn't require the floor truss to suspend the room above. As we wanted the cavity for air conditioning; cables, noise suppression and additional insulation it was only 70mm thick
Ive been on the roof already; and its amazing to see how study it is; together with the lack of clunking noise you hear from underneath. The contractor naturally raves about the product; its going to be interesting to see if we can hear any noise on completion with: insulation, drywall, yellowtounge and flooring down as well!
Termimesh has been installed ready for wall panels! |
![]() |
Home Theatre rack under the staircase |
The gum veins really give it some character, and what attracted us to it was the different hue's in each piece. I wish the photos could do this timber some justice! Earl the owner is very excited to get started on this project, its great to find real professionals they love what they do. Plus supporting our locals and not just buying shite from hardly normal.
Bring on the rest of the frame hopefully lock up before winter!